✔Microsoft Office (Excel, Word, and PowerPoint)
✔AUTOCAD
✔CSi Softwares(SAP2000, CSi Bridge, ETABS, SAFE)
✔SW Road
✔RCDC
✔SketchUp
✔Python Programming Language (Intermediate)
✔HTML/CSS (Beginner).
✔Leadership
✔Strong communication
✔Critical thinking.
Responsible for:
✔ Carrying out structural analysis and design of earthquake-resistant buildings.
✔ Preparing property valuation documents.
1. Construction of Federal Parliament Building Complex, Singha Durbar, Kathmandu. (June 11, 2023, to August 12, 2023)
Responsible for:
✔ Supervising and monitoring site works to maintain the construction quality.
1. Upgrading of Bharatpur-Madi Thori Hulaki Sadak (Postal Highway), Debendrapur dekhi-Bagai Bus Park Section, Chitwan. (Sep 19, 2021, to April 25, 2023)
Responsible for:
✔ Preparing bills, and all other necessary documents.
✔ Supervising and monitoring all site works to ensure quality and proper use of materials.
2. DBST works with earthwork excavation, retaining structure, and line drain works along Ram Mandir Okherbote Road. (Jan 11, 2020, to Sep 17, 2021)
Responsible for:
✔ Preparing bills, insurance claims, variation orders, and all other necessary documents.
✔ Supervising and monitoring all site works to ensure the right materials and methods are used during construction. Also, establishing, maintaining and implementing all quality standards.
As a part of undergraduate degree in the final year, we (Yam Kumar Oli, Nilam Sharma, Radheshyam Pd Kushwaha, Ramesh Gyawali, Ranjesh Shrestha and Sabin Shrestha) carried out this project under the supervision of Dr. Bharat Mandal. Sincere thanks to Motorable Local Roads Bridge Programme(LRBP), a Swiss agency that helps to build motorable bridges in Nepal, for funding and guiding which made alot easier to complete the project within stipulated duration. The scope of this project work was limited to data collection, structural analysis and design. We took courses on CSi Bridege and SAP for the structural analysis of the bridge at meroghar.com, although, we did manual analysis. Design was based on IRC and Nepal Bridge Standard 2067. Click here to read full report.
In the third year of my undergraduate degree, we (Yam Kumar Oli, Saroj Basnet, Milan Shrestha, Enjila Dahal, Arjun Gautam and Radheshyam Pd. Kushwaha) carried out 10 days survey camp under the supervision of Prof. Bhesh Kumar Karki, Prof. Sunita Ghimire and Prof. Ramesh Karki. The main objective of this camp was to get practical understanding of surveying principles. Our ultimate tasks included preparing topographic map of the area. Click here to view final topographic map.
Graduated with first division (73.2%).
Major Courses taken:
✔Stength of Materials
✔Theory of Structures I and II
✔Probablity and Statistics
✔Design of Steel and Timber Structures
✔Structural Dynamics
✔Earthquake Resistant Design of Structures
✔Disaster Risk Management
Graduated with distinction (79.0%).
Major Courses taken:
✔Physics
✔Chemistry
✔Mathematics
Graduated with distinction (83.0%).
District second of the S.L.C batch-2069 among students of goverment school in Dang.
Major Courses taken:
✔Mathematics
✔Additional Mathematics
✔Science
✔Computer Science